Manchester Grand Hyatt

Manchester_Grand_Hyatt_350x250.jpg

Location
San Diego, CA

Architect
Martinez and Cutri

Engineer
Dynalectric Company / Randall Lamb and Associates 

General Contractor
Clark Construction Group

Dynalectric San Diego provided complete electrical and low voltage design and construction services for a new 34-story tower expansion for Manchester Grand Hyatt.  

The expansion project included 750 guest rooms, a central lobby, 30,000 square foot ballroom, and 34,000 square foot exhibit hall. 

Our team helped maintain services to the existing hotel during construction by relocating the existing fireman’s control room to the new tower, integrating the property management and point of sale systems, and creating a temporary hotel lobby.

Our scope of work included:

  • Complete high voltage electrical system and equipment
  • Fire alarm and life/safety
  • Telecommunications/data
  • Security/CCTV
  • Audio-visual networking
  • Power generation

With this addition, the Manchester Grand Hyatt on San Diego Bay is now one of the largest and tallest waterfront hotels on the west coast.