Palomar Chiller Addition, Escondido, California

Palomar_Chiller_Addition.jpg

SCOPE OF WORK

This is a prototype project for GE designed to improve the efficiency of their turbines.  Specifically, the installation of a new chiller plant of 9,600 tons to feed chilled water to pre-cool the inlet air intakes for the existing GE turbines at an existing 500MW merchant power plant in Escondido.  Our scope includes the complete installation, testing and commissioning of all electrical and instrumentation and control systems. The Electrical scope included modifications to the existing 4160 KV distribution, installation of harmonics filters, variable frequency drives and power transformers in addition to all the oversized equipment that would normally be associated with a Chiller plant.

OBJECTIVES / VALUE DELIVERED

  • Fast Track Construction,
  • Daily coordination with GE J&B, 
  • Instrumentation and control start up
  • Commissioning Support
INDUSTRIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
Jackson & Blanc

ENGINEER:
General Electric

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box_check.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box.gif Tele-Data Communications
  case_box.gif Security/CCTV
  case_box_check.gif Building Automation
  case_box_check.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box.gif Power Generation