Imperial Valley Resource Recovery, Imperial Valley, California

Imperial_Valley_Resource_Recovery.jpg

SCOPE OF WORK

This renewable energy project was restoration of fire damage to the electrical systems and plant controls of an 18MW biomass power plant. The scope of work included design/build electrical systems for 15kV, 5kV, 480V MCC’s, distribution panels, UPS, fire alarm system and process control system. The control platform is an MTL Distributed Control System (DCS) with redundant processors, 1400 Input/Output (I/O) points and Wonderware HMI front end. The DCS is designed to monitor and control the steam turbine, boiler, fuel handling systems and auxiliary systems. Dynalectric provided a turnkey system including design, configuration, installation, commissioning and training. This biomass power plant consumes 420 tons of recycled wood a day to generate 18 MW of renewable energy.

OBJECTIVES / VALUE DELIVERED

  • Quick design turnaround
  • Full budgeting throughout the design process
  • Integration of systems during design
  • Fast track construction
  • Budget control
INDUSTRIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
PCI / IVRR Co.,LLC

ENGINEER:
PID Engineering
Dynalectric Company

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box_check.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box_check.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box_check.gif Building Automation
  case_box_check.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box_check.gif Power Generation