Marine Corps Air Station Miramar - Hangars 1 & 3, San Diego, CA

repairshan.jpg

SCOPE OF WORK

At the Marine Corps Air Station (MCAS) in Miramar, this $12.6 million project involved the restoration of two hangers. The project included asbestos abatement, seismic upgrades, a new trench draining system, roof replacement, as well as HVAC and electrical upgrades. Other improvements included upgrading office space, resurfacing slabs and adding new floor coating and repainting.

MILITARY
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
Douglas E. Barnhart, Inc.

ARCHITECT:
The Benham Group

ENGINEER:
LSW Engineering

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box_check.gif Power Generation