California State University San Marcos Parking Structure,
San Marcos, CA

cs_edu_csusm_parking.jpg

SCOPE OF WORK

This project consisted of a new 486,000 square-foot, 1,602 stall design-build parking structure for California State University, San Marcos. The six-story structure was on-grade and constructed of post tensioned concrete. Four elevators and a pedestrian bridge connect the parking structure to the adjacent campus. The parking garage is fully covered by fire sprinklers.

EDUCATION
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
PCL Construction

ARCHITECT:
RJC Architects

ENGINEER:
Dynalectric Company
Michael Wall Engineering

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box_check.gif Power Generation