SCOPE OF WORK

The Qualcomm Project consists of four parts; a Data Center, Central Plant, Parking Structure, Labs & Offices.  The Central plant consists of (1) 4.6 megawatt cogeneration, (3) 2.7 megawatt diesel generators, (2) 1.6 megawatt UPS, (1) 1 megawatt UPS and (2) 600 kilowatt UPS. The Central Plant provides 12kv distribution of normal and emergency power to the campus. In addition the Central Plant has four 860 Ton electric chillers and one 1150 Ton steam absorption chiller that provide the cooling for the Data Center and balance of the campus.  This facility will be utilized for Qualcomm’s development of cellular technologies, it is considered to be the Qualcomm’s core business.  Therefore they are requiring that the facility be taken to N plus 1 of reliability for the power and cooling.  

OBJECTIVES / VALUE DELIVERED

  • Quick design turnaround
  • Full budgeting throughout the design process
  • Integration of systems during design
  • Fast track construction
COMMERCIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
Roel Construction

ARCHITECT:
Delawie Wilkes Rodrigues Barker

ENGINEER:
ILA Zammit

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box_check.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box_check.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box_check.gif Instrumentation and Control Systems
  case_box_check.gif HVAC/DDC Controls
  case_box_check.gif Audio and Video Networking
  case_box_check.gif Power Generation