Jack In The Box, San Diego, CA

cs_com_jack.jpg

SCOPE OF WORK

This design-build project consisted of a two-story, 45,000 square-foot corporate office/training facility for Jack In The Box restaurants. This fast track project had a 22-week construction period and was completed on time and budget.

COMMERCIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
DPR Construction, Inc.

ARCHITECT:
The McCulley Group

ENGINEER:
ILA Zammit Engineers

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box_check.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box.gif Power Generation