High Bluff Ridge, San Diego, CA

cs_com_highbluff.jpg

SCOPE OF WORK

High Bluff Ridge consists of one three-story and one four-story Class A office building with subterranean parking and a stand-alone 152-stall parking structure. The project totals approximately 157,859 net rentable square-feet and provides a total of 616 parking spaces.

High Bluff Ridge is located on 7.8 acres of the San Diego Corporate Center, a 102-acre master planned office park.

The buildings are constructed of structural steel framing and stone exteriors, with floor plates ranging from 21,000 square feet to 23,000 square feet, with saw-toothed corners to maximize corner office window lines. Each floor provides the capability to design up to 12 potential corner offices.

COMMERCIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
Swinerton Builders

ARCHITECT:
Carrier Johnson

ENGINEER:
TKG Consulting Engineers

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box_check.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box_check.gif Power Generation