College Grove Center, San Diego, CA

cs_com_college_grove.jpg

SCOPE OF WORK

The College Grove renovation project included the entire shell, core and utility infrastructure being reworked and updated. The original parking lot lighting was removed and replaced with a new system. This 40-year-old mall was brought up to today’s standards with a very fast- paced schedule.

COMMERCIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
Soltek Pacific

ARCHITECT:
SGPA Architects

ENGINEER:
Dynalectric Company
Kruse & Associates

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box_check.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box.gif Power Generation