2020 Plaza, San Diego, CA

cs_com-2020plaza.jpg

SCOPE OF WORK

This design-build project consisted of a complete build out of floors two through ten, totaling more than 81,000 square-feet.

Tenants of the building include Taylor Ball Construction, M-Power, World Travel, New England Financial, Bridi & Bridi, Parnell Kerr Forester, and Gergurich & Max.

The final phase of the project was the completion of Bob Bradley’s office, the owner of the building.

OBJECTIVES / VALUE DELIVERED

  • Quick design turnaround
  • Full budgeting throughout the design process
  • Integration of systems during design
  • Fast track construction
  • Budget control
COMMERCIAL
 

OPERATING COMPANY:
Dynalectric - San Diego

CLIENT:
Taylor Ball

ARCHITECT:
Maggetti Elam Associates

ENGINEER:
Dynalectric Company

 

cs_value.gif

 

  case_box_check.gif Total Electrical
  case_box.gif High-Voltage Systems
  case_box_check.gif Fire Alarm and Life Safety
  case_box.gif Tele-Data Communications
  case_box_check.gif Security/CCTV
  case_box.gif Building Automation
  case_box.gif Instrumentation and Control Systems
  case_box.gif HVAC/DDC Controls
  case_box.gif Audio and Video Networking
  case_box_check.gif Power Generation